The following projects refer to the structural design involvement of Panos Vafiopoulos at works covering the period
of his participation as a permanent member of the structural firm OMETE S.A.
The following projects refer to the structural design involvement of Panos Vafiopoulos at works covering the period
of his participation as a permanent member of the structural firm OMETE S.A.
•Athens concert hall ,phase b (design-supervision)
•Greece Electrical power facility at Ag. Dimitrios - AEGEK S.A.
•Structural design of phase B for Athens wastewater treatment plant at Psitalia.
•Hellenic Railways Organization – Railway overpass at Thiva - Final design.
(Reinforced concrete frame 18m length x 10m wide )
•Hellenic Railways Organization – Railway station and station platforms design
(2 Stations at Korinos and Avlona, culverts & earthworks - Final design)
•Project section A17, Koropi-Spata– Bridge of branch 21Α – Final design
(4 pre stressed bridges each 90.0m length. 3 span 28.5, 30.0, 28.5 continuous frame. Pre stressed box girder deck with 2 voids and side cantilevers .Pier height at 10.0m and 22m length pile foundation.
•Project section A17, Koropi-Spata – Archeological site bridge – Final design.
(9 span, 30.0 m each, bridge. Pre stressed box girder deck with 2 voids and side cantilevers.Pier height 12.m, circular cross section and 100cm diameter pile foundation.
•Project section A17, Koropi-Spata Airport – Archeological site and branch 21Z .
(6 span, 30.0 m each, bridge.
Pre stressed box girder deck with 2 voids and side cantilevers .Pier height 14.m , circular cross section and 120cm diameter pile foundation.
•Project section A17, Koropi-Spata Airport– Right branch bridge – Final design ( pre stressed concrete bridge with total length 360.0m, consists of 4 independent sections with the following span lengths 88.50m, 90,0m, 120m, 62mPrestressed box girder deck with 2 voids and side cantilevers .Pier height 10.m , circular cross section and 120cm diameter pile foundation.
•Project section A17, Koropi-Spata Airport –Π27Ν road overpass – Final design ΤΕ08.
(2 pre stressed concrete bridges total length 92.0m and 32.0m wide each. Continuous frame of 2 spans 46.0m each. Pre stressed box girder deck with 3 voids and side cantilevers . The piers consist of 3 circular cross section columns of 150cm diameter and the abutments are of rectangular wall cross section. Pile length 20.0m as foundation.
•Project section Α07-Zefyri-Axarnai – Multiple railway lines bridge – Final design. ΤΕ13
(Structuresforroadcoverage.Totallengthofconcretecoverframe 155.0 m, separatedwith 2 joints. Frameopeningvariesfrom 10 to 21m. The deck slab is 1.20m thick and is seated at both sides on piles).
•Project section Α18 Kontopeuko-Dexameni Avenue coverage at Km. 2+205 -2+705 Final design.
(Pre stressed concrete coverage frames with various openings from 23.10 to 26.60m. Total coverage length 500.0m. The deck cross section is a voided slab 1.40m thick and is seated at both sides on piles of 100cm diameter spaced at 1.20m distance.)
•Project section Α14 -Gerakas-Panagitsa– Stream coverage. Final design.
Open and closed box concrete cross sections. Top slab of compact reinforced concrete, superficial foundation
•Preliminary design phase of technical projects at Egnatia motorway (Vanianos-Iasmos section).
•Tenderphase, Kavala city detour, Preliminary design of 4 large scale bridges over a gorge.
•Amaliada interchange , overpass, final design.
(continuous frame 3 span bridge total length 80m ,deck of voided slab)
•Final design phase of technical projects at Egnatia motorway (4th section Grevena-Kozani km.31+100 – km.51+340)
•Tender phase, design of a reliable technical solution of Kifisos river bank ,Athens.
•Tender phase, design of Ardasriver multiple span bridge.
•Tender phase, design of various earthworks and structures (bridges, culverts etc) for the Pireus city detour motorway.
•Tender phase, design of various earthworks and structures (bridges, culverts etc) Egnatia motorway (km.25+191 – km.35+436 Kristalopigi - Psiloraxi section).
•Construction of a new military hospital at Thessaloniki,Greece (424).
•Tender design of a new hospital at Katerini, Greece.
•Katechaki - Pentagono line, design of temporary and permanent structures. Construction method cut and cover, temporary pile retaining wall, use of pre stressed anchors.
•Design of various temporary and permanent structures and amendments.
•South extension of line 2Dafni - Hlioupoli permanent structure design (cut and cover).
•Tender phase offer, design of various earthworks and structures (bridges, culverts etc) Egnatia motorway (Asprovalta-Strimonas Bridge section).
•Patras city detour, section K4-K5 Milichos river bridge. Final design phase.
(2 pre stressed bridges, left and right motorway branch total length 119.50 each. Continuous frame, 4 span bridge consisted of precast, pre stressed beams of total length 29.50m and height 1.70m+0.20 slab.3 circular cross section piers of 1.50m diameter and pile foundation consisted of piles with 100-120cm diameter and 15-20m length.)
•Tender phase, design of various earthworks and structures (bridges, culverts etc) Egnatia motorway (km.6+000 – km.19+000 Grevena-Kozani section).
•Egnatia motorway, construction of Paliampela - Ardaniou intersection , 3 overpasses – Final design.
•New dairy products factory for DELTA company at Ag. Stefanos Athens.
•Designofbombshellbasesfor Greek ammunition factory.
•Restoration and strengthening of a house complex at Drosia, Athens.
•Six storey building at Volos, Greece
(6 storeys 6280m2 + 1 basement 1500sqm)
•Residential complex at Drosia, Athens suburbs
•Eight storey building at Pagrati, Athens.
•One storey building with basement total 1000 sqm at Kifisia , Athens suburbs.
•Egnatia motorway, construction of Klidi - Kouloura section -2 overpasses km 6+003 &, km12+688 – Final design.
(one span bridge at km 6+003 28.0 m length and at km 12+688 35.20mrespectively.The deck consists of precast pre stressed beams of 1.70m height+0.20m slab
•FOURLISS.A building located at Athens-Lamia motorway
(2 storeys superstructure 5600sqm + 3 storeys substructure 11500sqm )
•Hellenic Railways Organization – Preliminary design and final design of railway bridges for the Athens – Patra railway network section, (4 underpasses , box frames , retaining walls, 2 overpasses)
2 pre stressed bridges :
a..Krathis river bridge, overpass of total length 63m..Precast deck, frame of 3 spans of 21m.each , 8.0m pier height and 100-120 cm cross section diameter and 15-20m. length pile foundation.
b. Ladopotamos river bridge, overpass of total length 110m. Precast deck, frame of 4 spans of 30m and 20m , 8.0-16m pier height and 100-120 cm cross section diameter and 25m. length pile foundation.
•Egnatia motorway, construction of section4.3.2-Polimilos-Galani, Archeological site overpass.- Final design. (2003)
(2 new Egnatia motorway branches. 2 span bridge of total length 73m. Bridge consisted of precast, pre stressed beams of total length 36.50m and height 2.20m+0.28 slab. Circular cross section piers-piles of 1.50m diameter serve also as foundation.)
•Restoration and strengthening of a former police building at Pireus city.
•Civitel Hotel at Kifisias str. Athens – precast structure (5 storeys 2437 sqm nd 2 basements 3292sqm )
•Aghialos Airport – Fire stationbuilding.
•ΜΕΤΚΑS.A Greece - Pakistan Karachi Electricity power production building – Final design.
•Structural design for the building permission issue, owner Charalambidis Har.
• Structural design for the building permission issue, owner Kaniaris G
• New three storey house with basement and swimming pool at Pikermi, Athens.
• Design check of a bridge precast prestressed beam at Chios island.
• Bridge at Chios island. ( DΕΗ ).(association with Maraveas office)
•Rehabilitation centre–Filoktitis S.A.
(4 storey building 6000sqm area each.)
•Structural design for the building permission issue, owner Spanos Bas.
•Structural design forthe building permission issue, owner Papanagiotou Pan.
•Pipe road underpass , Motor oil Hellas
•Design check of the structural foundation capacity of the equipment C-101, C-201, C-205 C-3702 of the refinery facilities at Motor oil Hellas.
•Thermos city museum. (association with Maraveas office)
•Design check of the structural capacity of a medical kidney clinic.
•Design check of the structural capacity of a building at Athens Ermoustr.
•Foundation design check of an oil storage tower base for MOTOR OIL HELLAS. (association with Maraveas office)
•Kavala city aquarium – preliminary design
•Detached house with basement at Zefiri, Athens.
•Structural interventions at 155 educational laboratories of North Greece.
•Structural design for the building permission issue, owner Baltas Apos.
•Structural design for the building permission issue, owner Basdeli Maria
•Structural design for the building permission issue, owner Elersa. (apartment build.)
•Structural check of preliminary bridge design of the Greek national central motorway.
•Sykia town bridge.
•Shop at Psiri, Athens.
•Structural foundation check of an apartment building at Korinthos city.
•Structural slab check of a pharmacy building at Athens.
•Bridge support modifications for the Greek train organization
•Structural design of the fish market building at Volos city. (association with Maraveas office)
•Structural design of Eupalio city mayor hall. (association with Maraveas office)
•Thessaloniki Metro, New railway station-Final design.
•Thessaloniki Metro, Dimokratias station-Final design.
•Thessaloniki Metro, Panepistimio station–Permanent structures- Final design.
•Structural design for the building permission issue, owner Skouras C.
•Design check of the structural capacity of a building at Korinthos city.
•Structural design of a slaughter house at Oiniades municipality.
•Facilities of DΕΥΑΜΒ
•Detached house at Thrakomacedones , Athens.
•Appartment building at Korinthos.
•Irakleion city at Crete museum (co-additional design-ΟΜΕΤΕ)
•Metal shelter for armored vehicles stationing.
•Detached house at Drafi , Athens.
•Tanks for waste water treatment at Leros island.
•Retaining wall and tank design for Spata city.
•Restoration of an elementary school at Elliniko city, Athens.
•Structural design forthe building permission issue, owner Makrigiannis K.
•Wine storage tanks foundations at Aspropirgos , Athens.
•Structural design for the building permission issue, owner Bourtzos D. 2 buildings with a swimming pool 2008 (Leukada island)
•Connection of Tzoumerka region with Egnatia motorway. (preliminary design - final design of 2 bridges -cantilever construction)
•Two storey building with basement at Pikermi.
•Two houses at Kyparisia.
•Restoration for a municipal building at Paylias town.
•Apartment building at Kallithea, Athens.
•Design check of the structural capacity of a apartment building at Ilioupoli, Athens.
•Design check of the structural capacity of a stone bridge at Farkadona region.(association with Maraveas office)
•Design check of the structural capacity of a steel building.
•Shop at Nauplion city ,structural design.
•Addition of two storeys at existing building at Ag. Paraskevi , Athens
•Structural interventions at 58 schools. (association with Maraveas office)
•Design check of the structural capacity of a apartment building at Ag. Anargiri, Athens
•Restoration and structural capacity design of a café at Athens ,Skoufa str.
•National Highway police precast building at Thermopiles region.(association with Maraveas office)
•Pipe steel support at Motor oil Hellas(association with Maraveas office)
•Sperxeios bridge- Final design.
(River overpass, total bridge length 118.10m , 3 spans, deck of precast pre stressed beams 1.80m height, piers of orthogonal cross section, pile with 30m length as foundation).
•Lamia city dike – Final design
(Dike overpass, total bridge length 110.0m , 4 spans, deck of 5 precast pre stressed beams for each branch , piers of orthogonal cross section, pile with 35m length as foundation).
•2 Bridges at km5+679.08 of the motorway, branch ΑΒ2 km 2+712.60 and km 3+036.62 - Final design.
•E65 motorway Bridge at km 25+365 of the motorway. – Final design.
(Gorge overpass , 2 motorway bridges construction. 4 span bridges with total length 137m. Deck of precast pre stressed beams, piers of orthogonal cross section, pile with 15m length as foundation).
•E65 motorway overpasses Τ40, Τ47 , underpass Κ013. – Final design.
(Single span bridges 30.0m long and 22.10m wide.
Precast pre stressed concrete beams and in situ 0.20 m slab seated on bearings).
•Structural design for the building permission issue, owner Tsironis L. building with a swimming pool 2010 (Voula, Athens)
•Coverage of Makrygianni street at Thesaloniki, method of coverage Cover& Cut. Total length 233m. and span length 18.50m.Coverage beam- slab of reinforcement concrete 1.60 height seated on piles at 1.50m distance.
•ΕΥDΕ- ΜΕDΕ Underpass ΤΕ23Α (Vafiopoulos-ΟΜΕΤΕ SA)
•Structural design for the building permission issue, owner Georgiou K. stone masonry building (Serifos island)
•Structural design for the building permission issue, owner Georgiou I. stone masonry buildings (Serifos island)
(Vafiopoulos- OMETE SA)
-Opera house 28000sqm area
-National library 22000sqm area
-Park construction, sport facilities & park.
-Esplanade
Seismic isolated buildings.
•Structural design for the building permission issue, owner Georgiou I. stone masonry buildings (Serifos island)
•Structural design for the building permission issue, owner Georgiou K. stone masonry buildings (Serifos island)
•Structural design for the building permission issue, owner Kitriniaris A. (Kithira island)