sgengineers | Structural verifications for Copenhagen Metro Denmark
502
portfolio_page-template-default,single,single-portfolio_page,postid-502,ajax_fade,page_not_loaded,,qode_grid_1300,side_area_uncovered_from_content,qode-child-theme-ver-1.0.0,qode-theme-ver-17.2,qode-theme-bridge,disabled_footer_top,wpb-js-composer js-comp-ver-5.6,vc_responsive

Structural verifications for Copenhagen Metro Denmark

Year

2017

Client

ANDERMANN ENGINEERING DENMARK A.P.S.

Category
Latest Projects
About This Project

Copenhagen metro station supply of support/consultancy services to ANDERMANN ENGINEERING DENMARK A.P.S.
The services are provided for three (3) stations: MMK, NUP and RHP.
-Assessment of Secant Piles/Diaphragm Walls conditions.
-Piles verification for allowable lost piles configurations.
-Lining Walls Option A+ re-verification: upon ANDERMANN DK input, a re-calculation of Lining Walls with a reduced thickness.